United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTBESS Stadium
BESS Stadium is a 9.9 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Jim Wells County, Texas.
Queue statusConsented
- Planning (completed)
- ConsentedFeb 2024 (current stage)
- Construction (not yet reached)
- OperatingTarget Jan 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 25INR0696
- Grid region
- ERCOT (Texas)
- Developer
- Grenergy USA
- Connection point (POI)
- Substation: Stadium, XFMR # Substation transmission kV: 69kV ERCOT Station Long Name (ERCOT model): STADIUM ERCOT Station site code (short name): STADIUM ERCOT BUS# 8889 ERCOT Load Name: 2_69_12
- Location
- Jim Wells County, Texas
- Technology
- Battery: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- IA Executed
- Queue status
- Active
- Agreement signed
- 26 February 2024
- Proposed online date
- January 2026
Location
Marker shows the centre of Jim Wells County; the queue data does not give exact sites.
Other requests in Jim Wells County
- Orange Grove BESSSolar + storage · 61.4 MW · agreement signed
- Jim Wells BESSBattery storage · 100 MW · in study
- Raghorn Solar SLFSolar + storage · 91.9 MW · in study
- Beaverhead Solar SLFSolar + storage · 61.5 MW · in study
- Beaverhead Storage SLFSolar + storage · 61.5 MW · in study
- Bandana Solar SLFSolar · 86.9 MW · suspended
- Orange Grove SolarSolar + storage · 131 MW · built
- Osprey1Gas · 150 MW · withdrawn
- Millhouse SolarSolar · 75.0 MW · withdrawn
- Millhouse StorageOther · 38.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem