United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · ERCOTOrange Grove Solar
Orange Grove Solar is a 131 MW solar + storage request built and operating in the ERCOT interconnection queue, in Jim Wells County, Texas.
Request details
- Queue ID
- 21INR0393
- Grid region
- ERCOT (Texas)
- Developer
- Enbridge Solar (Orange Grove), LLC
- Connection point (POI)
- 5660 Orange Grove 138kV
- Location
- Jim Wells County, Texas
- Technology
- Solar: 131 MW · Battery
- Total requested
- 131 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 11 July 2019
- Agreement signed
- 8 June 2022
- Proposed online date
- June 2025
- Came online
- April 2025
Location
Marker shows the centre of Jim Wells County; the queue data does not give exact sites.
Other requests in Jim Wells County
- Orange Grove BESSSolar + storage · 61.4 MW · agreement signed
- BESS StadiumBattery storage · 9.9 MW · agreement signed
- Jim Wells BESSBattery storage · 100 MW · in study
- Raghorn Solar SLFSolar + storage · 91.9 MW · in study
- Beaverhead Solar SLFSolar + storage · 61.5 MW · in study
- Beaverhead Storage SLFSolar + storage · 61.5 MW · in study
- Bandana Solar SLFSolar · 86.9 MW · suspended
- Osprey1Gas · 150 MW · withdrawn
- Millhouse SolarSolar · 75.0 MW · withdrawn
- Millhouse StorageOther · 38.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem