GAS Β· ERCOT

Osprey1

Osprey1 is a 150 MW gas request withdrawn in the ERCOT interconnection queue, in Jim Wells County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2018 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0236
Grid region
ERCOT (Texas)
Developer
Alta Power LLC
Connection point (POI)
8503 Alice 138kV
Location
Jim Wells County, Texas
Technology
Gas: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 December 2018
Proposed online date
April 2021
Withdrawn
July 2019

Location

Marker shows the centre of Jim Wells County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Jim Wells County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem