United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBandana Solar SLF
Bandana Solar SLF is a 86.9 MW solar request suspended in the ERCOT interconnection queue, in Jim Wells County, Texas.
Queue statusPaused / redesign
- PlanningQueued Apr 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 29INR0090
- Grid region
- ERCOT (Texas)
- Location
- Jim Wells County, Texas
- Technology
- Solar: 86.9 MW
- Total requested
- 86.9 MW
- Queue status
- Suspended
- Entered queue
- 20 April 2025
Location
Marker shows the centre of Jim Wells County; the queue data does not give exact sites.
Other requests in Jim Wells County
- Orange Grove BESSSolar + storage Β· 61.4 MW Β· agreement signed
- BESS StadiumBattery storage Β· 9.9 MW Β· agreement signed
- Jim Wells BESSBattery storage Β· 100 MW Β· in study
- Raghorn Solar SLFSolar + storage Β· 91.9 MW Β· in study
- Beaverhead Solar SLFSolar + storage Β· 61.5 MW Β· in study
- Beaverhead Storage SLFSolar + storage Β· 61.5 MW Β· in study
- Orange Grove SolarSolar + storage Β· 131 MW Β· built
- Osprey1Gas Β· 150 MW Β· withdrawn
- Millhouse SolarSolar Β· 75.0 MW Β· withdrawn
- Millhouse StorageOther Β· 38.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem