United States › Grid › Interconnection queues › Texas

SOLAR + STORAGE · ERCOT

Beaverhead Storage SLF

Beaverhead Storage SLF is a 61.5 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Jim Wells County, Texas.

Queue statusIn planning
  1. PlanningQueued Aug 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jul 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0308
Grid region
ERCOT (Texas)
Developer
Beaverhead Solar, LLC
Connection point (POI)
Direct to Sub 69kv #5653 Ben Bolt.
Location
Jim Wells County, Texas
Technology
Battery: 61.5 MW · Battery
Total requested
61.5 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
16 August 2024
Proposed online date
July 2027

Location

Marker shows the centre of Jim Wells County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Jim Wells County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem