United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTMillhouse Storage
Millhouse Storage is a 38.0 MW other request withdrawn in the ERCOT interconnection queue, in Jim Wells County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2017 (completed)
- Withdrawn / abandonedAug 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0188
- Grid region
- ERCOT (Texas)
- Developer
- Cypress Creek Renewables
- Connection point (POI)
- tap 69kV 8500 Alice - 8889 Stadium
- Location
- Jim Wells County, Texas
- Technology
- Other: 38.0 MW
- Total requested
- 38.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 12 November 2017
- Proposed online date
- December 2020
- Withdrawn
- August 2021
Location
Marker shows the centre of Jim Wells County; the queue data does not give exact sites.
Other requests in Jim Wells County
- Orange Grove BESSSolar + storage Β· 61.4 MW Β· agreement signed
- BESS StadiumBattery storage Β· 9.9 MW Β· agreement signed
- Jim Wells BESSBattery storage Β· 100 MW Β· in study
- Raghorn Solar SLFSolar + storage Β· 91.9 MW Β· in study
- Beaverhead Solar SLFSolar + storage Β· 61.5 MW Β· in study
- Beaverhead Storage SLFSolar + storage Β· 61.5 MW Β· in study
- Bandana Solar SLFSolar Β· 86.9 MW Β· suspended
- Orange Grove SolarSolar + storage Β· 131 MW Β· built
- Osprey1Gas Β· 150 MW Β· withdrawn
- Millhouse SolarSolar Β· 75.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem