United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTHighway 6 BESS
Highway 6 BESS is a 9.9 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Brazos County, Texas.
Queue statusConsented
- Planning (completed)
- ConsentedJan 2025 (current stage)
- Construction (not yet reached)
- OperatingTarget Mar 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 26INR0520
- Grid region
- ERCOT (Texas)
- Developer
- Hwy 6 Infra LLC
- Connection point (POI)
- substation - HWY6 Substation kv - 138 Ercot Lond Name - Highway 6 ERCOT station code - HWY6 ERCOTBus # - 6 ERCOTLoad Name - HWY6_1 NMMS Node #: 3165
- Location
- Brazos County, Texas
- Technology
- Battery: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- IA Executed
- Queue status
- Active
- Agreement signed
- 30 January 2025
- Proposed online date
- March 2026
Location
Marker shows the centre of Brazos County; the queue data does not give exact sites.
Other requests in Brazos County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem