United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Highway 6 BESS

Highway 6 BESS is a 9.9 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Brazos County, Texas.

Queue statusConsented
  1. Planning (completed)
  2. ConsentedJan 2025 (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2026 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
26INR0520
Grid region
ERCOT (Texas)
Developer
Hwy 6 Infra LLC
Connection point (POI)
substation - HWY6 Substation kv - 138 Ercot Lond Name - Highway 6 ERCOT station code - HWY6 ERCOTBus # - 6 ERCOTLoad Name - HWY6_1 NMMS Node #: 3165
Location
Brazos County, Texas
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
IA Executed
Queue status
Active
Agreement signed
30 January 2025
Proposed online date
March 2026

Location

Marker shows the centre of Brazos County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem