Requests shown8516.1 GW
Active in queue76.0 GW356 requests
Agreement signed24.2 GW103 requests
Withdrawn8516.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

85 requests · page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Paluxy Solar
Solar · S&S Renewables LLC
1,029 MWWithdrawn / abandoned ERCOT Jan 2023target 2027
Jack County III – 138 kV
Gas · Jack County Power Development, LLC
660 MWWithdrawn / abandoned ERCOT Nov 2023target 2026
Apis Solar
Solar · S&S Renewables LLC
534 MWWithdrawn / abandoned Bee, TXERCOT Jul 2023target 2026
Paluxy Storage
Battery storage · S&S Renewables LLC
512 MWWithdrawn / abandoned ERCOT Jan 2023target 2027
Upstream BESS
Battery storage · Upstream Storage LLC
462 MWWithdrawn / abandoned Johnson, TXERCOT Mar 2023target 2026
Larisa BESS
Battery storage · ME USA PROJECT II LLC
419 MWWithdrawn / abandoned ERCOT Mar 2023target 2026
Farrier Station Energy Storage
Battery storage · Farrier Station Energy Storage Project, LLC
410 MWWithdrawn / abandoned ERCOT Jan 2023target 2028
Bedias Solar Park
Solar · Misae Energy III
400 MWWithdrawn / abandoned Grimes, TXERCOT Oct 2023target 2026
Umbra Solar II
Solar · Saddle House Solar Project, LLC
345 MWWithdrawn / abandoned Franklin, TXERCOT Jun 2023target 2027
Barbers Hill BESS
Battery storage · Black Mountain Energy Storage II
308 MWWithdrawn / abandoned ERCOT Jan 2023target 2027
Valhalla Solar
Solar · Industrial Papa Project LLC
307 MWWithdrawn / abandoned Brazoria, TXERCOT Mar 2023target 2026
Tyler BESS
Battery storage · SMT Tyler LLC
305 MWWithdrawn / abandoned ERCOT Jul 2023target 2027
Fox Run Energy Storage
Other · Fox Run Energy Project, LLC
301 MWWithdrawn / abandoned Jones, TXERCOT Feb 2023target 2026
Harden BESS
Battery storage · BRP Blue Topaz 14, LLC
301 MWWithdrawn / abandoned ERCOT Jul 2023target 2025
Blossomheath BESS
Battery storage · Taurbeng LLC
301 MWWithdrawn / abandoned Ellis, TXERCOT May 2023target 2026
Apis Storage
Battery storage · S&S Renewables LLC
268 MWWithdrawn / abandoned Bee, TXERCOT Jun 2023target 2026
OCI SunRoper ESS
Other · OCI SunRoper LLC
266 MWWithdrawn / abandoned Wharton, TXERCOT Jan 2023target 2026
Emerald Hill Energy Storage
Battery storage · Emerald Hill Energy Storage LLC
261 MWWithdrawn / abandoned Dallas, TXERCOT Feb 2023target 2027
Horse Wrangler Solar
Solar · Horse Wrangler Solar Project, LLC
251 MWWithdrawn / abandoned ERCOT Dec 2023target 2028
Prairie Switch PV1 SLF
Solar · FRESH AIR ENERGY II, LLC
239 MWWithdrawn / abandoned Wharton, TXERCOT Mar 2023target 2027
Holly Branch Solar
Solar · Holly Branch Solar, LLC
231 MWWithdrawn / abandoned ERCOT Jun 2023target 2027
Mercedes II BESS
Battery storage · SMT Mercedes II, LLC
228 MWWithdrawn / abandoned Hidalgo, TXERCOT May 2023target 2025
PowerVault BESS
Other · SMT Dallas V, LLC
228 MWWithdrawn / abandoned Dallas, TXERCOT Jul 2023target 2025
Aquamarine BESS
Battery storage · ME USA Project I LLC
214 MWWithdrawn / abandoned ERCOT Jun 2023target 2029
Butterfield Energy Storage
Battery storage · Butterfield Energy Storage LLC
208 MWWithdrawn / abandoned ERCOT Nov 2023target 2026
Malala Storage
Battery storage · Malala Storage, LLC
206 MWWithdrawn / abandoned ERCOT Oct 2023target 2028
Wallie Storage
Battery storage · Wallie Storage, LLC
205 MWWithdrawn / abandoned ERCOT Mar 2023target 2027
Fort Watt Storage
Battery storage · Fort Watt Storage, LLC
205 MWWithdrawn / abandoned Tarrant, TXERCOT Jan 2023target 2027
Jerboa BESS
Battery storage · Jerboa Storage, LLC
201 MWWithdrawn / abandoned ERCOT Aug 2023target 2027
Yellow Rose BESS
Battery storage · Black Mountain Energy Storage II
201 MWWithdrawn / abandoned ERCOT Oct 2023target 2027
Wadsworth Storage Energy Center
Battery storage · Nova Clean Energy Real Estate, LLC
201 MWWithdrawn / abandoned ERCOT Oct 2023target 2026
Silver Spur Energy Center
Battery storage · Silver Spur Energy Center, LLC
201 MWWithdrawn / abandoned ERCOT Dec 2023target 2027
Blue Bird BESS
Other · Gigawatt Solar LLC
201 MWWithdrawn / abandoned Hood, TXERCOT Jun 2023target 2026
Gold Rush Energy Storage
Other · Goldthwaite Energy Storage, LLC
201 MWWithdrawn / abandoned Mills, TXERCOT Aug 2023target 2026
Cumbia Energy Center
Battery storage · Cumbia Energy Center, LLC
200 MWWithdrawn / abandoned Nueces, TXERCOT Mar 2023target 2028
Noor Solar
Solar · Industrial Kilo Project LLC
188 MWWithdrawn / abandoned Liberty, TXERCOT Oct 2023target 2028
Delta Lake Irrigation District 1 Solar
Solar · Mestenas Floating Solar LLC
187 MWWithdrawn / abandoned Hidalgo, TXERCOT May 2023target 2027
Brackens Solar
Solar · Brackens Solar
177 MWWithdrawn / abandoned Freestone, TXERCOT May 2023target 2027
MegaCharge BESS
Other · SMT Dallas II LLC
169 MWWithdrawn / abandoned Dallas, TXERCOT Jul 2023target 2026
Live Oak Bayou Solar SLF
Solar · FRESH AIR ENERGY II, LLC
156 MWWithdrawn / abandoned Matagorda, TXERCOT May 2023target 2027
Shawnee Bottom Solar
Solar · Shawnee Bottom Solar, LLC
153 MWWithdrawn / abandoned ERCOT Sep 2023target 2026
Matias Solar
Solar · Industrial Bravo Project II LLC
152 MWWithdrawn / abandoned ERCOT Mar 2023target 2028
Unruh Solar
Solar · BT Unruh Solar, LLC
151 MWWithdrawn / abandoned ERCOT Jul 2023target 2025
Micot BESS
Battery storage · UR-Silo DevCo LLC
150 MWWithdrawn / abandoned ERCOT Mar 2023target 2025
SkySealy2
Gas · Sky Global Power 2, LLC
150 MWWithdrawn / abandoned Austin, TXERCOT May 2023target 2025
Umbra BESS II
Battery storage · Saddle House Solar Project, LLC
150 MWWithdrawn / abandoned Franklin, TXERCOT Jun 2023target 2027
Giralda Solar
Solar · Blue Stone Renewable XX LLC
137 MWWithdrawn / abandoned Van Zandt, TXERCOT Sep 2023target 2026
OCI SunShiner Solar
Solar · OCI SunShiner LLC
130 MWWithdrawn / abandoned Zavala, TXERCOT Feb 2023target 2026
Hess King Solar Farm
Solar · Facility Innovations Group
130 MWWithdrawn / abandoned ERCOT Apr 2023target 2025
Palacios BESS
Battery storage · BRP BLUE TOPAZ 11, LLC
126 MWWithdrawn / abandoned Cameron, TXERCOT May 2023target 2027
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)