OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Paluxy Solar Solar · S&S Renewables LLC |
1,029 MW | Withdrawn / abandoned |
| Jack County III ‚Äì 138 kV Gas · Jack County Power Development, LLC |
660 MW | Withdrawn / abandoned |
| Apis Solar Solar · S&S Renewables LLC |
534 MW | Withdrawn / abandoned |
| Paluxy Storage Battery storage · S&S Renewables LLC |
512 MW | Withdrawn / abandoned |
| Upstream BESS Battery storage · Upstream Storage LLC |
462 MW | Withdrawn / abandoned |
| Larisa BESS Battery storage · ME USA PROJECT II LLC |
419 MW | Withdrawn / abandoned |
| Farrier Station Energy Storage Battery storage · Farrier Station Energy Storage Project, LLC |
410 MW | Withdrawn / abandoned |
| Bedias Solar Park Solar · Misae Energy III |
400 MW | Withdrawn / abandoned |
| Umbra Solar II Solar · Saddle House Solar Project, LLC |
345 MW | Withdrawn / abandoned |
| Barbers Hill BESS Battery storage · Black Mountain Energy Storage II |
308 MW | Withdrawn / abandoned |
| Valhalla Solar Solar · Industrial Papa Project LLC |
307 MW | Withdrawn / abandoned |
| Tyler BESS Battery storage · SMT Tyler LLC |
305 MW | Withdrawn / abandoned |
| Fox Run Energy Storage Other · Fox Run Energy Project, LLC |
301 MW | Withdrawn / abandoned |
| Harden BESS Battery storage · BRP Blue Topaz 14, LLC |
301 MW | Withdrawn / abandoned |
| Blossomheath BESS Battery storage · Taurbeng LLC |
301 MW | Withdrawn / abandoned |
| Apis Storage Battery storage · S&S Renewables LLC |
268 MW | Withdrawn / abandoned |
| OCI SunRoper ESS Other · OCI SunRoper LLC |
266 MW | Withdrawn / abandoned |
| Emerald Hill Energy Storage Battery storage · Emerald Hill Energy Storage LLC |
261 MW | Withdrawn / abandoned |
| Horse Wrangler Solar Solar · Horse Wrangler Solar Project, LLC |
251 MW | Withdrawn / abandoned |
| Prairie Switch PV1 SLF Solar · FRESH AIR ENERGY II, LLC |
239 MW | Withdrawn / abandoned |
| Holly Branch Solar Solar · Holly Branch Solar, LLC |
231 MW | Withdrawn / abandoned |
| Mercedes II BESS Battery storage · SMT Mercedes II, LLC |
228 MW | Withdrawn / abandoned |
| PowerVault BESS Other · SMT Dallas V, LLC |
228 MW | Withdrawn / abandoned |
| Aquamarine BESS Battery storage · ME USA Project I LLC |
214 MW | Withdrawn / abandoned |
| Butterfield Energy Storage Battery storage · Butterfield Energy Storage LLC |
208 MW | Withdrawn / abandoned |
| Malala Storage Battery storage · Malala Storage, LLC |
206 MW | Withdrawn / abandoned |
| Wallie Storage Battery storage · Wallie Storage, LLC |
205 MW | Withdrawn / abandoned |
| Fort Watt Storage Battery storage · Fort Watt Storage, LLC |
205 MW | Withdrawn / abandoned |
| Jerboa BESS Battery storage · Jerboa Storage, LLC |
201 MW | Withdrawn / abandoned |
| Yellow Rose BESS Battery storage · Black Mountain Energy Storage II |
201 MW | Withdrawn / abandoned |
| Wadsworth Storage Energy Center Battery storage · Nova Clean Energy Real Estate, LLC |
201 MW | Withdrawn / abandoned |
| Silver Spur Energy Center Battery storage · Silver Spur Energy Center, LLC |
201 MW | Withdrawn / abandoned |
| Blue Bird BESS Other · Gigawatt Solar LLC |
201 MW | Withdrawn / abandoned |
| Gold Rush Energy Storage Other · Goldthwaite Energy Storage, LLC |
201 MW | Withdrawn / abandoned |
| Cumbia Energy Center Battery storage · Cumbia Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Noor Solar Solar · Industrial Kilo Project LLC |
188 MW | Withdrawn / abandoned |
| Delta Lake Irrigation District 1 Solar Solar · Mestenas Floating Solar LLC |
187 MW | Withdrawn / abandoned |
| Brackens Solar Solar · Brackens Solar |
177 MW | Withdrawn / abandoned |
| MegaCharge BESS Other · SMT Dallas II LLC |
169 MW | Withdrawn / abandoned |
| Live Oak Bayou Solar SLF Solar · FRESH AIR ENERGY II, LLC |
156 MW | Withdrawn / abandoned |
| Shawnee Bottom Solar Solar · Shawnee Bottom Solar, LLC |
153 MW | Withdrawn / abandoned |
| Matias Solar Solar · Industrial Bravo Project II LLC |
152 MW | Withdrawn / abandoned |
| Unruh Solar Solar · BT Unruh Solar, LLC |
151 MW | Withdrawn / abandoned |
| Micot BESS Battery storage · UR-Silo DevCo LLC |
150 MW | Withdrawn / abandoned |
| SkySealy2 Gas · Sky Global Power 2, LLC |
150 MW | Withdrawn / abandoned |
| Umbra BESS II Battery storage · Saddle House Solar Project, LLC |
150 MW | Withdrawn / abandoned |
| Giralda Solar Solar · Blue Stone Renewable XX LLC |
137 MW | Withdrawn / abandoned |
| OCI SunShiner Solar Solar · OCI SunShiner LLC |
130 MW | Withdrawn / abandoned |
| Hess King Solar Farm Solar · Facility Innovations Group |
130 MW | Withdrawn / abandoned |
| Palacios BESS Battery storage · BRP BLUE TOPAZ 11, LLC |
126 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)486 · 198.6 GW
- West (non-ISO utilities)547 · 166.5 GW
- SPP (Southwest Power Pool)336 · 71.5 GW
- NYISO (New York)138 · 40.7 GW
- Southeast (non-ISO utilities)331 · 40.7 GW
- ERCOT (Texas)85 · 16.1 GW
- ISO-NE (New England)119 · 15.7 GW
- MISO (Midcontinent)10 · 1,143 MW
- PJM (Mid-Atlantic, Midwest)11 · 867 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)