OTHER Β· ERCOTPowerVault BESS
PowerVault BESS is a 228 MW other request withdrawn in the ERCOT interconnection queue, in Dallas County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0453
- Grid region
- ERCOT (Texas)
- Developer
- SMT Dallas V, LLC
- Connection point (POI)
- Tap 138 kV 3035 LVBRD2 - 3032 LVBRD2T_x000D_
- Location
- Dallas County, Texas
- Technology
- Other: 228 MW
- Total requested
- 228 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 17 July 2023
- Proposed online date
- June 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of Dallas County; the queue data does not give exact sites.
Other requests in Dallas County
- Empire Central BESSBattery storage Β· 10.0 MW Β· agreement signed
- Thunder Road Energy StorageBattery storage Β· 153 MW Β· in study
- watermelon 6 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 2 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 1 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 3 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 4 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 5 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 8 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 7 energy storageBattery storage Β· 102 MW Β· in study
- Atlanta TxHSR TPSS DS-1Other Β· 50.0 MW Β· in study
- Best Southwest BESSBattery storage Β· 241 MW Β· suspended