United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTEmpire Central BESS
Empire Central BESS is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Dallas County, Texas.
Queue statusConsented
- PlanningQueued Jan 2024 (completed)
- ConsentedMay 2024 (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 24INR0659
- Grid region
- ERCOT (Texas)
- Developer
- SMT Dallas III LLC
- Connection point (POI)
- Station name: EMPCT, Load name: LDLXFMR2, XFMR Number: 2, Bus Number:2799, Voltage: 138kV
- Location
- Dallas County, Texas
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Active
- Entered queue
- 29 January 2024
- Agreement signed
- 20 May 2024
- Proposed online date
- December 2025
Location
Marker shows the centre of Dallas County; the queue data does not give exact sites.
Other requests in Dallas County
- Thunder Road Energy StorageBattery storage · 153 MW · in study
- watermelon 6 energy storageBattery storage · 102 MW · in study
- watermelon 2 energy storageBattery storage · 102 MW · in study
- watermelon 1 energy storageBattery storage · 102 MW · in study
- watermelon 3 energy storageBattery storage · 102 MW · in study
- watermelon 4 energy storageBattery storage · 102 MW · in study
- watermelon 5 energy storageBattery storage · 102 MW · in study
- watermelon 8 energy storageBattery storage · 102 MW · in study
- watermelon 7 energy storageBattery storage · 102 MW · in study
- Atlanta TxHSR TPSS DS-1Other · 50.0 MW · in study
- Best Southwest BESSBattery storage · 241 MW · suspended
- HGP Pacesetter BESSBattery storage · 201 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem