United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTBest Southwest BESS
Best Southwest BESS is a 241 MW battery storage request suspended in the ERCOT interconnection queue, in Dallas County, Texas.
Queue statusPaused / redesign
- PlanningQueued May 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0348
- Grid region
- ERCOT (Texas)
- Location
- Dallas County, Texas
- Technology
- Battery: 241 MW
- Total requested
- 241 MW
- Queue status
- Suspended
- Entered queue
- 15 May 2022
- Proposed online date
- May 2025
Location
Marker shows the centre of Dallas County; the queue data does not give exact sites.
Other requests in Dallas County
- Empire Central BESSBattery storage · 10.0 MW · agreement signed
- Thunder Road Energy StorageBattery storage · 153 MW · in study
- watermelon 6 energy storageBattery storage · 102 MW · in study
- watermelon 2 energy storageBattery storage · 102 MW · in study
- watermelon 1 energy storageBattery storage · 102 MW · in study
- watermelon 3 energy storageBattery storage · 102 MW · in study
- watermelon 4 energy storageBattery storage · 102 MW · in study
- watermelon 5 energy storageBattery storage · 102 MW · in study
- watermelon 8 energy storageBattery storage · 102 MW · in study
- watermelon 7 energy storageBattery storage · 102 MW · in study
- Atlanta TxHSR TPSS DS-1Other · 50.0 MW · in study
- HGP Pacesetter BESSBattery storage · 201 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem