OTHER Β· ERCOTBlue Bird BESS
Blue Bird BESS is a 201 MW other request withdrawn in the ERCOT interconnection queue, in Hood County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0149
- Grid region
- ERCOT (Texas)
- Developer
- Gigawatt Solar LLC
- Connection point (POI)
- Tap 345kV 1880 Rocky Creek - 1898 Mitchel Bend
- Location
- Hood County, Texas
- Technology
- Other: 201 MW
- Total requested
- 201 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 27 June 2023
- Proposed online date
- November 2026
- Withdrawn
- June 2024
Location
Marker shows the centre of Hood County; the queue data does not give exact sites.
Other requests in Hood County
- Apache Hill BESSBattery storage Β· 201 MW Β· agreement signed
- Tolar Energy CenterGas Β· 1,252 MW Β· in study
- Wolf Hollow IIIGas Β· 306 MW Β· in study
- Rain Lily Solar 1Solar + storage Β· 148 MW Β· in study
- Rain Lily Storage 1Solar + storage Β· 106 MW Β· in study
- DeCordova BESS additionOther Β· 263 MW Β· built
- Wolf Hollow 2 repowerGas Β· 44.0 MW Β· built