BATTERY STORAGE Β· ERCOT

Farrier Station Energy Storage

Farrier Station Energy Storage is a 410 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0374
Grid region
ERCOT (Texas)
Developer
Farrier Station Energy Storage Project, LLC
Connection point (POI)
MONTICELLO SES (BUS# 1696) - ALLEN SWITCH (BUS# 2514)
Technology
Battery: 410 MW
Total requested
410 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
17 January 2023
Proposed online date
June 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem