Matias Solar

Matias Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0076
Grid region
ERCOT (Texas)
Developer
Industrial Bravo Project II LLC
Connection point (POI)
8114 Conoco 138kV
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 March 2023
Proposed online date
March 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in