BATTERY STORAGE Β· ERCOT

Harden BESS

Harden BESS is a 301 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0456
Grid region
ERCOT (Texas)
Developer
BRP Blue Topaz 14, LLC
Connection point (POI)
7671 Macedonia 138kV
Technology
Battery: 301 MW
Total requested
301 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
31 July 2023
Proposed online date
September 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem