BATTERY STORAGE Β· ERCOT

Yellow Rose BESS

Yellow Rose BESS is a 201 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0338
Grid region
ERCOT (Texas)
Developer
Black Mountain Energy Storage II
Connection point (POI)
Tap Stone Creek Switch (1839) β€šΓ„Γ¬ Sherman Northwest (1732)
Technology
Battery: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 October 2023
Proposed online date
February 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem