United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTEmerald Hill Energy Storage
Emerald Hill Energy Storage is a 261 MW battery storage request withdrawn in the ERCOT interconnection queue, in Dallas County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0363
- Grid region
- ERCOT (Texas)
- Developer
- Emerald Hill Energy Storage LLC
- Connection point (POI)
- Desoto Switch (2431) - Cedar Hill Switch (2420) 345kV Line
- Location
- Dallas County, Texas
- Technology
- Battery: 261 MW
- Total requested
- 261 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 26 February 2023
- Proposed online date
- June 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Dallas County; the queue data does not give exact sites.
Other requests in Dallas County
- Empire Central BESSBattery storage · 10.0 MW · agreement signed
- Thunder Road Energy StorageBattery storage · 153 MW · in study
- watermelon 6 energy storageBattery storage · 102 MW · in study
- watermelon 2 energy storageBattery storage · 102 MW · in study
- watermelon 1 energy storageBattery storage · 102 MW · in study
- watermelon 3 energy storageBattery storage · 102 MW · in study
- watermelon 4 energy storageBattery storage · 102 MW · in study
- watermelon 5 energy storageBattery storage · 102 MW · in study
- watermelon 8 energy storageBattery storage · 102 MW · in study
- watermelon 7 energy storageBattery storage · 102 MW · in study
- Atlanta TxHSR TPSS DS-1Other · 50.0 MW · in study
- Best Southwest BESSBattery storage · 241 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem