BATTERY STORAGE · ERCOT

Emerald Hill Energy Storage

Emerald Hill Energy Storage is a 261 MW battery storage request withdrawn in the ERCOT interconnection queue, in Dallas County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0363
Grid region
ERCOT (Texas)
Developer
Emerald Hill Energy Storage LLC
Connection point (POI)
Desoto Switch (2431) - Cedar Hill Switch (2420) 345kV Line
Location
Dallas County, Texas
Technology
Battery: 261 MW
Total requested
261 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
26 February 2023
Proposed online date
June 2027
Withdrawn
July 2025

Location

Marker shows the centre of Dallas County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Dallas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem