Fox Run Energy Storage

Fox Run Energy Storage is a 301 MW other request withdrawn in the ERCOT interconnection queue, in Jones County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0210
Grid region
ERCOT (Texas)
Developer
Fox Run Energy Project, LLC
Connection point (POI)
Kirchhoff Substation (PTI#60704)
Location
Jones County, Texas
Technology
Other: 301 MW
Total requested
301 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 February 2023
Proposed online date
July 2026
Withdrawn
February 2024

Location

Marker shows the centre of Jones County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Jones County