Valhalla Solar

Valhalla Solar is a 307 MW solar request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. ConsentedDec 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0042
Grid region
ERCOT (Texas)
Developer
Industrial Papa Project LLC
Connection point (POI)
Tap 138 kV 42215 Copper to 42195 Booster
Location
Brazoria County, Texas
Technology
Solar: 307 MW
Total requested
307 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
8 March 2023
Agreement signed
6 December 2023
Proposed online date
May 2026
Withdrawn
February 2025

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem