United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Gold Rush Energy Storage

Gold Rush Energy Storage is a 201 MW other request withdrawn in the ERCOT interconnection queue, in Mills County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2023 (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0199
Grid region
ERCOT (Texas)
Developer
Goldthwaite Energy Storage, LLC
Connection point (POI)
7070 Goldthwaite Substation 138kV
Location
Mills County, Texas
Technology
Other: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 August 2023
Proposed online date
December 2026
Withdrawn
December 2023

Location

Marker shows the centre of Mills County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Mills County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem