SOLAR Β· ERCOT

Paluxy Solar

Paluxy Solar is a 1,029 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0046
Grid region
ERCOT (Texas)
Developer
S&S Renewables LLC
Connection point (POI)
Double tapping: 345kV 5915 STP - 5133 Elm Creek ckt#1 and 345kV 5068 Cachena β€šΓ„Γ¬ 5323 Old Hickory ckt#2
Technology
Solar: 1,029 MW
Total requested
1,029 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
3 January 2023
Proposed online date
June 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem