United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTPaluxy Solar
Paluxy Solar is a 1,029 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0046
- Grid region
- ERCOT (Texas)
- Developer
- S&S Renewables LLC
- Connection point (POI)
- Double tapping: 345kV 5915 STP - 5133 Elm Creek ckt#1 and 345kV 5068 Cachena βΓΓ¬ 5323 Old Hickory ckt#2
- Technology
- Solar: 1,029 MW
- Total requested
- 1,029 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 3 January 2023
- Proposed online date
- June 2027
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem