Bedias Solar Park

Bedias Solar Park is a 400 MW solar request withdrawn in the ERCOT interconnection queue, in Grimes County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0126
Grid region
ERCOT (Texas)
Developer
Misae Energy III
Connection point (POI)
44645 Singleton 345kV
Location
Grimes County, Texas
Technology
Solar: 400 MW
Total requested
400 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
25 October 2023
Proposed online date
June 2026
Withdrawn
October 2023

Location

Marker shows the centre of Grimes County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Grimes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem