Giralda Solar

Giralda Solar is a 137 MW solar request withdrawn in the ERCOT interconnection queue, in Van Zandt County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0224
Grid region
ERCOT (Texas)
Developer
Blue Stone Renewable XX LLC
Connection point (POI)
Tap 345kV 3105 ELKTON_5 --- 3100 MARTINLK_5_x000D_
Location
Van Zandt County, Texas
Technology
Solar: 137 MW
Total requested
137 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
21 September 2023
Proposed online date
December 2026
Withdrawn
December 2023

Location

Marker shows the centre of Van Zandt County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Van Zandt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem