United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTKellam Solar
Kellam Solar is a 59.8 MW solar request built and operating in the ERCOT interconnection queue, in Van Zandt County, Texas.
Request details
- Queue ID
- 20INR0261
- Grid region
- ERCOT (Texas)
- Developer
- BT Kellam Solar, LLC
- Connection point (POI)
- 6852 Ben Wheeler 138kV
- Location
- Van Zandt County, Texas
- Technology
- Solar: 59.8 MW
- Total requested
- 59.8 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 18 March 2019
- Agreement signed
- 30 July 2019
- Proposed online date
- December 2020
- Came online
- December 2020
Location
Marker shows the centre of Van Zandt County; the queue data does not give exact sites.
Other requests in Van Zandt County
- Zorro BESSBattery storage Β· 154 MW Β· agreement signed
- Whiskey BESSBattery storage Β· 154 MW Β· agreement signed
- Caney Creek SolarSolar Β· 121 MW Β· agreement signed
- Amador StorageBattery storage Β· 102 MW Β· agreement signed
- Sierra Diablo Energy StorageBattery storage Β· 204 MW Β· in study
- Wood Fern WindOnshore wind Β· 197 MW Β· in study
- Goldfinch SolarSolar + storage Β· 151 MW Β· in study
- Benitoite StorageBattery storage Β· 126 MW Β· in study
- Edgewood BESS 2Battery storage Β· 102 MW Β· in study
- Edgewood BESS 1Battery storage Β· 102 MW Β· in study
- Goldfinch StorageSolar + storage Β· 100 MW Β· in study
- Giralda SolarSolar Β· 137 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem