πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

SkySealy2

SkySealy2 is a 150 MW gas request withdrawn in the ERCOT interconnection queue, in Austin County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandonedJun 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0411
Grid region
ERCOT (Texas)
Developer
Sky Global Power 2, LLC
Connection point (POI)
tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65
Location
Austin County, Texas
Technology
Gas: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 May 2023
Proposed online date
June 2025
Withdrawn
June 2024

Location

Marker shows the centre of Austin County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Austin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem