United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Malala Storage

Malala Storage is a 206 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0274
Grid region
ERCOT (Texas)
Developer
Malala Storage, LLC
Connection point (POI)
2434 Seagoville SW 138kV
Technology
Battery: 206 MW
Total requested
206 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 October 2023
Proposed online date
April 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem