United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTFort Watt Storage
Fort Watt Storage is a 205 MW battery storage request withdrawn in the ERCOT interconnection queue, in Tarrant County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2023 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- ConsentedAug 2024 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0498
- Grid region
- ERCOT (Texas)
- Developer
- Fort Watt Storage, LLC
- Connection point (POI)
- Tap 138kV 1933 Kennedale - 2208 Mansfield
- Location
- Tarrant County, Texas
- Technology
- Battery: 205 MW
- Total requested
- 205 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 2 January 2023
- Agreement signed
- 28 August 2024
- Proposed online date
- August 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Tarrant County; the queue data does not give exact sites.
Other requests in Tarrant County
- Stockyard Grid BattBattery storage · 151 MW · agreement signed
- Meadow Park BESSBattery storage · 10.0 MW · agreement signed
- Nabla Energy Storage IBattery storage · 750 MW · in study
- Team Ranch StorageBattery storage · 307 MW · in study
- Anglin BESSBattery storage · 206 MW · in study
- Salazar BESSBattery storage · 128 MW · in study
- Chisholm GridOther · 102 MW · built
- Century BESSOther · 9.9 MW · built
- Firefly PowerBattery storage · 401 MW · withdrawn
- Onshore wind project GEN-2004-001, Tarrant CountyOnshore wind · 200 MW · withdrawn
- Solar Star Western Hills StorageOther · 160 MW · withdrawn
- Elmer BatteryOther · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem