OTHER Β· ERCOTElmer Battery
Elmer Battery is a 100 MW other request withdrawn in the ERCOT interconnection queue, in Tarrant County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0035
- Grid region
- ERCOT (Texas)
- Developer
- Energy Storage Resources, LLC
- Connection point (POI)
- 2208 Mansfield 138kV
- Location
- Tarrant County, Texas
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 16 May 2019
- Proposed online date
- January 2021
- Withdrawn
- September 2020
Location
Marker shows the centre of Tarrant County; the queue data does not give exact sites.
Other requests in Tarrant County
- Stockyard Grid BattBattery storage Β· 151 MW Β· agreement signed
- Meadow Park BESSBattery storage Β· 10.0 MW Β· agreement signed
- Nabla Energy Storage IBattery storage Β· 750 MW Β· in study
- Team Ranch StorageBattery storage Β· 307 MW Β· in study
- Anglin BESSBattery storage Β· 206 MW Β· in study
- Salazar BESSBattery storage Β· 128 MW Β· in study
- Chisholm GridOther Β· 102 MW Β· built
- Century BESSOther Β· 9.9 MW Β· built
- Firefly PowerBattery storage Β· 401 MW Β· withdrawn
- Fort Watt StorageBattery storage Β· 205 MW Β· withdrawn
- Onshore wind project GEN-2004-001, Tarrant CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar Star Western Hills StorageOther Β· 160 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem