United States › Grid › Interconnection queues › Texas
OTHER · ERCOTSolar Star Western Hills Storage
Solar Star Western Hills Storage is a 160 MW other request withdrawn in the ERCOT interconnection queue, in Tarrant County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0243
- Grid region
- ERCOT (Texas)
- Developer
- Solar Star Western Hills Storage, LLC
- Connection point (POI)
- Tap 138kV 1955 CALMONT SWITCH – 2087 Western Hills
- Location
- Tarrant County, Texas
- Technology
- Other: 160 MW
- Total requested
- 160 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 20 February 2022
- Proposed online date
- September 2025
- Withdrawn
- March 2024
Location
Marker shows the centre of Tarrant County; the queue data does not give exact sites.
Other requests in Tarrant County
- Stockyard Grid BattBattery storage · 151 MW · agreement signed
- Meadow Park BESSBattery storage · 10.0 MW · agreement signed
- Nabla Energy Storage IBattery storage · 750 MW · in study
- Team Ranch StorageBattery storage · 307 MW · in study
- Anglin BESSBattery storage · 206 MW · in study
- Salazar BESSBattery storage · 128 MW · in study
- Chisholm GridOther · 102 MW · built
- Century BESSOther · 9.9 MW · built
- Firefly PowerBattery storage · 401 MW · withdrawn
- Fort Watt StorageBattery storage · 205 MW · withdrawn
- Onshore wind project GEN-2004-001, Tarrant CountyOnshore wind · 200 MW · withdrawn
- Elmer BatteryOther · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem