United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTTeam Ranch Storage
Team Ranch Storage is a 307 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Tarrant County, Texas.
Queue statusIn planning
- PlanningQueued Jun 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 24INR0763
- Grid region
- ERCOT (Texas)
- Developer
- BAF Storage, LLC
- Connection point (POI)
- 1869 Benbrook Switch 345kV
- Location
- Tarrant County, Texas
- Technology
- Battery: 307 MW
- Total requested
- 307 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 13 June 2024
- Proposed online date
- March 2027
Location
Marker shows the centre of Tarrant County; the queue data does not give exact sites.
Other requests in Tarrant County
- Stockyard Grid BattBattery storage · 151 MW · agreement signed
- Meadow Park BESSBattery storage · 10.0 MW · agreement signed
- Nabla Energy Storage IBattery storage · 750 MW · in study
- Anglin BESSBattery storage · 206 MW · in study
- Salazar BESSBattery storage · 128 MW · in study
- Chisholm GridOther · 102 MW · built
- Century BESSOther · 9.9 MW · built
- Firefly PowerBattery storage · 401 MW · withdrawn
- Fort Watt StorageBattery storage · 205 MW · withdrawn
- Onshore wind project GEN-2004-001, Tarrant CountyOnshore wind · 200 MW · withdrawn
- Solar Star Western Hills StorageOther · 160 MW · withdrawn
- Elmer BatteryOther · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem