United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTMeadow Park BESS
Meadow Park BESS is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Tarrant County, Texas.
Queue statusConsented
- PlanningQueued Jun 2025 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Feb 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 26INR0699
- Grid region
- ERCOT (Texas)
- Developer
- Meadow Park ESS Assets, LLC
- Connection point (POI)
- Station Name: Meadow Park | Oncor 5-digit code: MDWPK | Oncor XFMR Number: 2 | ERCOT Bus Name: MEADPRK1_8 | ERCOT Bus#: 2039 | ERCOT Load Name: LDLXFMR2 | Substation Transmission kV: 138 kV | ERCOT No
- Location
- Tarrant County, Texas
- Technology
- Battery: 10.0 MW
- Total requested
- 10.0 MW
- Study phase
- MRD Approved
- Queue status
- Active
- Entered queue
- 19 June 2025
- Proposed online date
- February 2026
Location
Marker shows the centre of Tarrant County; the queue data does not give exact sites.
Other requests in Tarrant County
- Stockyard Grid BattBattery storage · 151 MW · agreement signed
- Nabla Energy Storage IBattery storage · 750 MW · in study
- Team Ranch StorageBattery storage · 307 MW · in study
- Anglin BESSBattery storage · 206 MW · in study
- Salazar BESSBattery storage · 128 MW · in study
- Chisholm GridOther · 102 MW · built
- Century BESSOther · 9.9 MW · built
- Firefly PowerBattery storage · 401 MW · withdrawn
- Fort Watt StorageBattery storage · 205 MW · withdrawn
- Onshore wind project GEN-2004-001, Tarrant CountyOnshore wind · 200 MW · withdrawn
- Solar Star Western Hills StorageOther · 160 MW · withdrawn
- Elmer BatteryOther · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem