ONSHORE WIND Β· SPPOnshore wind project GEN-2004-001, Tarrant County
Onshore wind project GEN-2004-001, Tarrant County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Tarrant County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2004 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2004-001
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Location
- Tarrant County, Texas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 6 January 2004
- Proposed online date
- December 2005
Location
Marker shows the centre of Tarrant County; the queue data does not give exact sites.
Other requests in Tarrant County
- Stockyard Grid BattBattery storage Β· 151 MW Β· agreement signed
- Meadow Park BESSBattery storage Β· 10.0 MW Β· agreement signed
- Nabla Energy Storage IBattery storage Β· 750 MW Β· in study
- Team Ranch StorageBattery storage Β· 307 MW Β· in study
- Anglin BESSBattery storage Β· 206 MW Β· in study
- Salazar BESSBattery storage Β· 128 MW Β· in study
- Chisholm GridOther Β· 102 MW Β· built
- Century BESSOther Β· 9.9 MW Β· built
- Firefly PowerBattery storage Β· 401 MW Β· withdrawn
- Fort Watt StorageBattery storage Β· 205 MW Β· withdrawn
- Solar Star Western Hills StorageOther Β· 160 MW Β· withdrawn
- Elmer BatteryOther Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem