United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Cumbia Energy Center

Cumbia Energy Center is a 200 MW battery storage request withdrawn in the ERCOT interconnection queue, in Nueces County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0015
Grid region
ERCOT (Texas)
Developer
Cumbia Energy Center, LLC
Connection point (POI)
8485 Westside Bulk 138kV
Location
Nueces County, Texas
Technology
Battery: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 March 2023
Proposed online date
December 2028
Withdrawn
December 2025

Location

Marker shows the centre of Nueces County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Nueces County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem