BATTERY STORAGE Β· ERCOT

Larisa BESS

Larisa BESS is a 419 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0373
Grid region
ERCOT (Texas)
Developer
ME USA PROJECT II LLC
Connection point (POI)
Tap 345kV 6235 Mulberry Creek β€šΓ„Γ¬ 60791 Perigee
Technology
Battery: 419 MW
Total requested
419 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 March 2023
Proposed online date
November 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem