United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· ERCOT

Mercedes II BESS

Mercedes II BESS is a 228 MW battery storage request withdrawn in the ERCOT interconnection queue, in Hidalgo County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0550
Grid region
ERCOT (Texas)
Developer
SMT Mercedes II, LLC
Connection point (POI)
TAP NORTH MERCEDES (BUS #8358) and NORTH WESLACO (BUS# 8357)
Location
Hidalgo County, Texas
Technology
Battery: 228 MW
Total requested
228 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 May 2023
Proposed online date
October 2025
Withdrawn
February 2025

Location

Marker shows the centre of Hidalgo County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hidalgo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem