United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Prairie Switch PV1 SLF

Prairie Switch PV1 SLF is a 239 MW solar request withdrawn in the ERCOT interconnection queue, in Wharton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0019
Grid region
ERCOT (Texas)
Developer
FRESH AIR ENERGY II, LLC
Connection point (POI)
5546 DANEVANG SWITCHING STATION 138kV_x000D_
Location
Wharton County, Texas
Technology
Solar: 239 MW
Total requested
239 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 March 2023
Proposed online date
September 2027
Withdrawn
November 2023

Location

Marker shows the centre of Wharton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Wharton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem