United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Live Oak Bayou Solar SLF

Live Oak Bayou Solar SLF is a 156 MW solar request withdrawn in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0021
Grid region
ERCOT (Texas)
Developer
FRESH AIR ENERGY II, LLC
Connection point (POI)
Tap 345kV Refuge (42400) - Hawkinsville (42440) ckt 27
Location
Matagorda County, Texas
Technology
Solar: 156 MW
Total requested
156 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 May 2023
Proposed online date
December 2027
Withdrawn
April 2025

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem