Apis Solar

Apis Solar is a 534 MW solar request withdrawn in the ERCOT interconnection queue, in Bee County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0153
Grid region
ERCOT (Texas)
Developer
S&S Renewables LLC
Connection point (POI)
Tap 345kV 8606 Goddard β€šΓ„Γ¬ 8689 Tango
Location
Bee County, Texas
Technology
Solar: 534 MW
Total requested
534 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
17 July 2023
Proposed online date
September 2026
Withdrawn
January 2025

Location

Marker shows the centre of Bee County; the queue data does not give exact sites.