BATTERY STORAGE Β· ERCOT

Micot BESS

Micot BESS is a 150 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0393
Grid region
ERCOT (Texas)
Developer
UR-Silo DevCo LLC
Connection point (POI)
Tap 345kV 44645 Singleton - 46500 Tomball Ckt 74
Technology
Battery: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 March 2023
Proposed online date
May 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem