United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBrackens Solar
Brackens Solar is a 177 MW solar request withdrawn in the ERCOT interconnection queue, in Freestone County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2023 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0423
- Grid region
- ERCOT (Texas)
- Developer
- Brackens Solar
- Connection point (POI)
- 3558 Ranchland 138 kV
- Location
- Freestone County, Texas
- Technology
- Solar: 177 MW
- Total requested
- 177 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 14 May 2023
- Proposed online date
- July 2027
- Withdrawn
- November 2025
Location
Marker shows the centre of Freestone County; the queue data does not give exact sites.
Other requests in Freestone County
- Piedra SolarSolar + storage Β· 282 MW Β· agreement signed
- Pin Peaking Energy Center 1 (TEF- Due Diligence)Gas Β· 228 MW Β· agreement signed
- Pin Peaking Energy Center 2 (TEF- Due Diligence)Gas Β· 228 MW Β· agreement signed
- Bar Candela Solar SLFSolar + storage Β· 200 MW Β· agreement signed
- Fairway StorageBattery storage Β· 120 MW Β· agreement signed
- Piedra BESSSolar + storage Β· 104 MW Β· agreement signed
- Jewett Energy Center 1 GasGas Β· 1,274 MW Β· in study
- Silver Dollar SolarSolar + storage Β· 302 MW Β· in study
- Amerada SolarSolar + storage Β· 302 MW Β· in study
- Simsboro StorageBattery storage Β· 302 MW Β· in study
- Douie SolarSolar Β· 221 MW Β· in study
- Freestone Battery Storage ProjectBattery storage Β· 211 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem