SOLAR Β· ERCOT

Brackens Solar

Brackens Solar is a 177 MW solar request withdrawn in the ERCOT interconnection queue, in Freestone County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0423
Grid region
ERCOT (Texas)
Developer
Brackens Solar
Connection point (POI)
3558 Ranchland 138 kV
Location
Freestone County, Texas
Technology
Solar: 177 MW
Total requested
177 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
14 May 2023
Proposed online date
July 2027
Withdrawn
November 2025

Location

Marker shows the centre of Freestone County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Freestone County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem