United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTButterfield Energy Storage
Butterfield Energy Storage is a 208 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0354
- Grid region
- ERCOT (Texas)
- Developer
- Butterfield Energy Storage LLC
- Connection point (POI)
- 575 Jack Electric 345kV
- Technology
- Battery: 208 MW
- Total requested
- 208 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 14 November 2023
- Proposed online date
- November 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem