MegaCharge BESS

MegaCharge BESS is a 169 MW other request withdrawn in the ERCOT interconnection queue, in Dallas County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0186
Grid region
ERCOT (Texas)
Developer
SMT Dallas II LLC
Connection point (POI)
To 138 kV Calumet Substation (Bus# 2852)
Location
Dallas County, Texas
Technology
Other: 169 MW
Total requested
169 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 July 2023
Proposed online date
April 2026
Withdrawn
October 2023

Location

Marker shows the centre of Dallas County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Dallas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem