United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTMegaCharge BESS
MegaCharge BESS is a 169 MW other request withdrawn in the ERCOT interconnection queue, in Dallas County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0186
- Grid region
- ERCOT (Texas)
- Developer
- SMT Dallas II LLC
- Connection point (POI)
- To 138 kV Calumet Substation (Bus# 2852)
- Location
- Dallas County, Texas
- Technology
- Other: 169 MW
- Total requested
- 169 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 9 July 2023
- Proposed online date
- April 2026
- Withdrawn
- October 2023
Location
Marker shows the centre of Dallas County; the queue data does not give exact sites.
Other requests in Dallas County
- Empire Central BESSBattery storage Β· 10.0 MW Β· agreement signed
- Thunder Road Energy StorageBattery storage Β· 153 MW Β· in study
- watermelon 6 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 2 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 1 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 3 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 4 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 5 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 8 energy storageBattery storage Β· 102 MW Β· in study
- watermelon 7 energy storageBattery storage Β· 102 MW Β· in study
- Atlanta TxHSR TPSS DS-1Other Β· 50.0 MW Β· in study
- Best Southwest BESSBattery storage Β· 241 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem