United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

OCI SunShiner Solar

OCI SunShiner Solar is a 130 MW solar request withdrawn in the ERCOT interconnection queue, in Zavala County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2023 (completed)
  2. Withdrawn / abandonedNov 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0290
Grid region
ERCOT (Texas)
Developer
OCI SunShiner LLC
Connection point (POI)
8672 LaPryor2A 138 kV
Location
Zavala County, Texas
Technology
Solar: 130 MW
Total requested
130 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 February 2023
Proposed online date
July 2026
Withdrawn
November 2024

Location

Marker shows the centre of Zavala County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Zavala County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem