SOLAR Β· ERCOTGirasol
Girasol is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Zavala County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0329
- Grid region
- ERCOT (Texas)
- Developer
- OCI SOLAR POWER
- Connection point (POI)
- La Pryor Substation
- Location
- Zavala County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Entered queue
- 20 May 2020
- Proposed online date
- December 2022
- Withdrawn
- January 2025
Location
Marker shows the centre of Zavala County; the queue data does not give exact sites.
Other requests in Zavala County
- Flying Kite SolarSolar + storage Β· 80.4 MW Β· agreement signed
- Bramble Energy CenterBattery storage Β· 225 MW Β· in study
- SunShiner ESSBattery storage Β· 200 MW Β· in study
- Flying Kite BessSolar + storage Β· 105 MW Β· in study
- La Mancha Storage SLFSolar + storage Β· 40.9 MW Β· in study
- La Mancha Solar SLFSolar + storage Β· 40.9 MW Β· in study
- McLean (Shakes) SolarSolar Β· 206 MW Β· built
- OCI SunShiner SolarSolar Β· 130 MW Β· withdrawn
- Peridot StorageBattery storage Β· 50.5 MW Β· withdrawn
- BARTLESVILLE SolarSolar Β· 4.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem