United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· ERCOT

Peridot Storage

Peridot Storage is a 50.5 MW battery storage request withdrawn in the ERCOT interconnection queue, in Zavala County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0444
Grid region
ERCOT (Texas)
Developer
BT Castro Storage, LLC
Connection point (POI)
5836 North Batesville 69kV
Location
Zavala County, Texas
Technology
Battery: 50.5 MW
Total requested
50.5 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 May 2023
Proposed online date
December 2025
Withdrawn
April 2025

Location

Marker shows the centre of Zavala County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Zavala County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem