SOLAR + STORAGE · ERCOTFlying Kite Solar
Flying Kite Solar is a 80.4 MW solar + storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Zavala County, Texas.
Queue statusConsented
- PlanningQueued Apr 2023 (completed)
- ConsentedOct 2024 (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 25INR0304
- Grid region
- ERCOT (Texas)
- Developer
- FLYING KITE SOLAR LLC
- Connection point (POI)
- Tap the 138 kV La Pryor (#8008) - Poblano (#8009)
- Location
- Zavala County, Texas
- Technology
- Solar: 80.4 MW · Battery
- Total requested
- 80.4 MW
- Study phase
- SS Completed, FIS Started, IA
- Queue status
- Active
- Entered queue
- 7 April 2023
- Agreement signed
- 2 October 2024
- Proposed online date
- December 2027
Location
Marker shows the centre of Zavala County; the queue data does not give exact sites.
Other requests in Zavala County
- Bramble Energy CenterBattery storage · 225 MW · in study
- SunShiner ESSBattery storage · 200 MW · in study
- Flying Kite BessSolar + storage · 105 MW · in study
- La Mancha Storage SLFSolar + storage · 40.9 MW · in study
- La Mancha Solar SLFSolar + storage · 40.9 MW · in study
- McLean (Shakes) SolarSolar · 206 MW · built
- GirasolSolar · 200 MW · withdrawn
- OCI SunShiner SolarSolar · 130 MW · withdrawn
- Peridot StorageBattery storage · 50.5 MW · withdrawn
- BARTLESVILLE SolarSolar · 4.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem