SOLAR Β· ERCOT

BARTLESVILLE Solar

BARTLESVILLE Solar is a 4.3 MW solar request withdrawn in the ERCOT interconnection queue, in Zavala County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandonedNov 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0284
Grid region
ERCOT (Texas)
Developer
MERIT SI DEVELOPMENT, LLC
Connection point (POI)
8285 Lipton 138kV
Location
Zavala County, Texas
Technology
Solar: 4.3 MW
Total requested
4.3 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 August 2019
Proposed online date
April 2021
Withdrawn
November 2019

Location

Marker shows the centre of Zavala County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Zavala County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem