🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas — page 39

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,094476.4 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,094 requests · page 39 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
Mars Solar
Solar
52.8 MWPaused / redesign Childress, TXERCOT Feb 2019
Onshore wind project GEN-2026-PR1, Ochiltree County
Onshore wind
52.6 MWIn study Ochiltree, TXSPP Dec 2025target 2030
MRG Goody Storage
Solar + storage · MRG Goody Solar Project LLC
52.3 MWAgreement signed Lamar, TXERCOT May 2022target 2026
Solar project GEN-2023-135, Bowie County
Solar
52.0 MWIn study Bowie, TXSPP Oct 2023target 2026
Sunbelt Storage
Solar + storage · Rose Hill Solar LLC
52.0 MWIn study Kaufman, TXERCOT Nov 2021target 2026
Steppe Reserve Storage
Battery storage · KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
Orchard Ray BESS
Battery storage · Pettus BESS
51.9 MWIn study Bee, TXERCOT Jun 2023target 2027
Fluvanna Max BESS SLF
Solar + storage · Fluvanna Max Solar LLC
51.8 MWIn study Scurry, TXERCOT Dec 2024target 2029
Findley BESS
Solar + storage · Gransolar Texas Sixteen, LLC
51.7 MWIn study Limestone, TXERCOT Feb 2024target 2028
High Chaparral BESS 138kV
Battery storage · High Chaparral Solar Project, LLC
51.7 MWPaused / redesign Brazoria, TXERCOT Jan 2021target 2023
Ryan Energy Storage
Battery storage · Ryan Storage LLC
51.6 MWAgreement signed Coryell, TXERCOT Jan 2019target 2026
Proving Ground BESS
Solar + storage · Lantana Solar LLC
51.4 MWIn study Schleicher, TXERCOT Jul 2023target 2028
GPlains Storage
Solar + storage · Gypsum Plains Solar, LLC
51.3 MWIn study Ector, TXERCOT Apr 2025target 2029
Big River BESS
Solar + storage · Rio Grande River Solar LLC
51.3 MWIn study Zapata, TXERCOT May 2021target 2028
Ayass BESS
Battery storage · Harvick BESS, LLC
51.3 MWIn study Throckmorton, TXERCOT Dec 2023target 2028
Black Bear BESS
Solar + storage · ESCONDIDO DRAW RESOURCES, LLC
51.2 MWIn study Crockett, TXERCOT Dec 2023target 2028
Crocus Storage
Solar + storage · Crocus Solar, LLC
51.0 MWIn study Stephens, TXERCOT Jan 2025target 2028
Lupinus Storage 3
Solar + storage · Lupinus Solar 2, LLC
50.9 MWAgreement signed Franklin, TXERCOT Sep 2023target 2026
Blanket Ranch North Storage
Solar + storage · Blanket Ranch North Solar, LLC
50.9 MWIn study Brown, TXERCOT Jun 2022target 2028
Lumberjack Storage
Battery storage · EDP Renewables North America LLC
50.9 MWAgreement signed Cherokee, TXERCOT Aug 2021target 2029
Midpoint Storage
Battery storage · Midpoint Solar, LLC
50.9 MWAgreement signed Hill, TXERCOT Oct 2021target 2026
Isaac Solar
Solar · Industrial Bravo Project LLC
50.7 MWAgreement signed Matagorda, TXERCOT Nov 2022target 2026
Volunteer Storage
Battery storage · Blackjack Storage LLC
50.6 MWIn study Caldwell, TXERCOT Jan 2019target 2028
Hooper Solar
Solar + storage · BT Brown Solar, LLC
50.5 MWIn study Lee, TXERCOT Dec 2022target 2027
Stegall Storage
Solar + storage · BT Martin Solar, LLC
50.5 MWIn study Robertson, TXERCOT Aug 2023target 2027
Albatross BESS
Battery storage · Albatross Solar, LLC
50.4 MWIn study Mclennan, TXERCOT May 2022target 2028
Dori BQ Solar
Solar + storage · Sunnyside Energy, LLC
50.4 MWAgreement signed Harris, TXERCOT Jun 2020target 2027
Pearl Crescent Storage
Solar + storage · RWE Solar Development, LLC
50.3 MWIn study Colorado, TXERCOT Dec 2019target 2026
Surfside Energy Storage
Battery storage · Rocky Mountain Energy Holdings, LLC
50.3 MWIn study Brazoria, TXERCOT Jul 2023target 2028
Findley Solar
Solar + storage · Gransolar Texas Sixteen, LLC
50.3 MWIn study Limestone, TXERCOT Oct 2021target 2028
Marick Rose BESS
Battery storage · Marick BESS
50.2 MWIn study Fort Bend, TXERCOT Jul 2023target 2026
Fort Chadbourne Cattle BESS
Battery storage · Fort Chadbourne BESS
50.2 MWIn study Coke, TXERCOT Aug 2023target 2027
Makalu Solar
Solar · Abei Energy Green X LLC
50.2 MWIn study Hunt, TXERCOT Jan 2021target 2028
Beeman BESS
Battery storage · Beeman BESS LLC
50.2 MWIn study Gonzales, TXERCOT Apr 2023target 2027
Voyager Storage
Battery storage · EDF Renewables Development, Inc.
50.1 MWIn study Wharton, TXERCOT Jan 2019target 2028
Tokyo TxHSR TPSS EW-1
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Ellis, TXERCOT Jan 2019target 2028
Battery storage project GEN-2023-SR9, Crosby County
Battery storage
50.0 MWAgreement signed Crosby, TXSPP Feb 2023target 2026
Edgewater Storage
Battery storage · Edgewater Battery Storage LLC
50.0 MWIn study Ellis, TXERCOT Apr 2019target 2028
Atlanta TxHSR TPSS DS-1
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Dallas, TXERCOT Jan 2019target 2028
Red Holly Storage
Solar + storage · GreenGo Energy
50.0 MWAgreement signed Dawson, TXERCOT Sep 2018target 2028
SS50S
Solar
50.0 MWAgreement signed El Paso, TXWest Sep 2022target 2025
Battery storage project GEN-2024-305, Marion County
Battery storage
50.0 MWIn study Marion, TXSPP Mar 2025target 2029
Barcelona TxHSR TPSS HN-4
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Harris, TXERCOT Jan 2019target 2028
Limewood Storage
Solar + storage · Limewood Bell Renewables LLC
50.0 MWAgreement signed Bell, TXERCOT Apr 2021target 2028
Red Holly Storage 1
Solar + storage · GreenGo Energy
50.0 MWAgreement signed Dawson, TXERCOT Jul 2018target 2028
Brightside Solar Alt POI
Solar · Brightside Solar, LLC
50.0 MWAgreement signed Live Oak, TXERCOT May 2022target 2026
Turin TxHSR TPSS HN-6
Other · Texas Central Rail Holdings, LLC
50.0 MWIn study Grimes, TXERCOT Sep 2019target 2028
Chariot Storage
Battery storage · Chariot Storage LLC
50.0 MWIn study Limestone, TXERCOT Mar 2019target 2028
Dart Energy Storage A1
Battery storage · Dart Energy Storage LLC
50.0 MWIn study Taylor, TXERCOT Feb 2025target 2028
Apogee Wind II
Onshore wind · King Creek Wind Farm 3, LLC
47.3 MWIn study Throckmorton, TXERCOT Jul 2021target 2027
Page 39 of 42

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)