United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 39
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Mars Solar Solar |
52.8 MW | Paused / redesign |
| Onshore wind project GEN-2026-PR1, Ochiltree County Onshore wind |
52.6 MW | In study |
| MRG Goody Storage Solar + storage · MRG Goody Solar Project LLC |
52.3 MW | Agreement signed |
| Solar project GEN-2023-135, Bowie County Solar |
52.0 MW | In study |
| Sunbelt Storage Solar + storage · Rose Hill Solar LLC |
52.0 MW | In study |
| Steppe Reserve Storage Battery storage · KCE TX 25, LLC |
51.9 MW | In study |
| Orchard Ray BESS Battery storage · Pettus BESS |
51.9 MW | In study |
| Fluvanna Max BESS SLF Solar + storage · Fluvanna Max Solar LLC |
51.8 MW | In study |
| Findley BESS Solar + storage · Gransolar Texas Sixteen, LLC |
51.7 MW | In study |
| High Chaparral BESS 138kV Battery storage · High Chaparral Solar Project, LLC |
51.7 MW | Paused / redesign |
| Ryan Energy Storage Battery storage · Ryan Storage LLC |
51.6 MW | Agreement signed |
| Proving Ground BESS Solar + storage · Lantana Solar LLC |
51.4 MW | In study |
| GPlains Storage Solar + storage · Gypsum Plains Solar, LLC |
51.3 MW | In study |
| Big River BESS Solar + storage · Rio Grande River Solar LLC |
51.3 MW | In study |
| Ayass BESS Battery storage · Harvick BESS, LLC |
51.3 MW | In study |
| Black Bear BESS Solar + storage · ESCONDIDO DRAW RESOURCES, LLC |
51.2 MW | In study |
| Crocus Storage Solar + storage · Crocus Solar, LLC |
51.0 MW | In study |
| Lupinus Storage 3 Solar + storage · Lupinus Solar 2, LLC |
50.9 MW | Agreement signed |
| Blanket Ranch North Storage Solar + storage · Blanket Ranch North Solar, LLC |
50.9 MW | In study |
| Lumberjack Storage Battery storage · EDP Renewables North America LLC |
50.9 MW | Agreement signed |
| Midpoint Storage Battery storage · Midpoint Solar, LLC |
50.9 MW | Agreement signed |
| Isaac Solar Solar · Industrial Bravo Project LLC |
50.7 MW | Agreement signed |
| Volunteer Storage Battery storage · Blackjack Storage LLC |
50.6 MW | In study |
| Hooper Solar Solar + storage · BT Brown Solar, LLC |
50.5 MW | In study |
| Stegall Storage Solar + storage · BT Martin Solar, LLC |
50.5 MW | In study |
| Albatross BESS Battery storage · Albatross Solar, LLC |
50.4 MW | In study |
| Dori BQ Solar Solar + storage · Sunnyside Energy, LLC |
50.4 MW | Agreement signed |
| Pearl Crescent Storage Solar + storage · RWE Solar Development, LLC |
50.3 MW | In study |
| Surfside Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
50.3 MW | In study |
| Findley Solar Solar + storage · Gransolar Texas Sixteen, LLC |
50.3 MW | In study |
| Marick Rose BESS Battery storage · Marick BESS |
50.2 MW | In study |
| Fort Chadbourne Cattle BESS Battery storage · Fort Chadbourne BESS |
50.2 MW | In study |
| Makalu Solar Solar · Abei Energy Green X LLC |
50.2 MW | In study |
| Beeman BESS Battery storage · Beeman BESS LLC |
50.2 MW | In study |
| Voyager Storage Battery storage · EDF Renewables Development, Inc. |
50.1 MW | In study |
| Tokyo TxHSR TPSS EW-1 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Battery storage project GEN-2023-SR9, Crosby County Battery storage |
50.0 MW | Agreement signed |
| Edgewater Storage Battery storage · Edgewater Battery Storage LLC |
50.0 MW | In study |
| Atlanta TxHSR TPSS DS-1 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Red Holly Storage Solar + storage · GreenGo Energy |
50.0 MW | Agreement signed |
| SS50S Solar |
50.0 MW | Agreement signed |
| Battery storage project GEN-2024-305, Marion County Battery storage |
50.0 MW | In study |
| Barcelona TxHSR TPSS HN-4 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Limewood Storage Solar + storage · Limewood Bell Renewables LLC |
50.0 MW | Agreement signed |
| Red Holly Storage 1 Solar + storage · GreenGo Energy |
50.0 MW | Agreement signed |
| Brightside Solar Alt POI Solar · Brightside Solar, LLC |
50.0 MW | Agreement signed |
| Turin TxHSR TPSS HN-6 Other · Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Chariot Storage Battery storage · Chariot Storage LLC |
50.0 MW | In study |
| Dart Energy Storage A1 Battery storage · Dart Energy Storage LLC |
50.0 MW | In study |
| Apogee Wind II Onshore wind · King Creek Wind Farm 3, LLC |
47.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)