United States › Grid › Interconnection queues › Texas

SOLAR · ERCOT

Brightside Solar Alt POI

Brightside Solar Alt POI is a 50.0 MW solar request with a signed interconnection agreement in the ERCOT interconnection queue, in Live Oak County, Texas.

Queue statusConsented
  1. PlanningQueued May 2022 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Aug 2026 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
23INR0487
Grid region
ERCOT (Texas)
Developer
Brightside Solar, LLC
Connection point (POI)
8156 Charter Substation 138kV
Location
Live Oak County, Texas
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
SS Completed, FIS Not Started, IA
Queue status
Active
Entered queue
16 May 2022
Proposed online date
August 2026

Location

Marker shows the centre of Live Oak County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Live Oak County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem