United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTCITY WEST Solar
CITY WEST Solar is a 4.1 MW solar request withdrawn in the ERCOT interconnection queue, in Live Oak County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2019 (completed)
- Withdrawn / abandonedSep 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0283
- Grid region
- ERCOT (Texas)
- Developer
- MERIT SI DEVELOPMENT, LLC
- Connection point (POI)
- 8507 Schottky 69kV
- Location
- Live Oak County, Texas
- Technology
- Solar: 4.1 MW
- Total requested
- 4.1 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 14 July 2019
- Proposed online date
- June 2023
- Withdrawn
- September 2022
Location
Marker shows the centre of Live Oak County; the queue data does not give exact sites.
Other requests in Live Oak County
- Bird Dog Energy StorageBattery storage Β· 60.4 MW Β· agreement signed
- Brightside Solar Alt POISolar Β· 50.0 MW Β· agreement signed
- Anagram SolarSolar Β· 131 MW Β· in study
- Buck Ranch Solar SLFSolar + storage Β· 40.8 MW Β· in study
- Buck Ranch Storage SLFSolar + storage Β· 40.8 MW Β· in study
- Urca SolarSolar Β· 204 MW Β· suspended